RFQly

China Supplier RFQ — OEM/ODM Quotation Request

A China supplier RFQ should quote FOB and EXW, state MOQ and tooling, define AQL quality control, list certifications (CE, FDA, LFGB…), and include a Mandarin summary. This guide shows exactly what to write so Chinese factories reply with comparable quotes — not vague prices.

Free download: 2-page sample China RFQ (PDF)

What a filled China RFQ looks like when it reaches a supplier. No account needed.

Download free PDF

Example excerpt: what suppliers receive

RFQ — Bamboo-lid Glass Jar 500ml · 5,000 units · FOB Shenzhen

Specs (OEM): borosilicate glass, bamboo lid with silicone seal, custom box. Target FOB under €2.90 at 10k units.

QC: AQL major 2.5 / minor 4.0 with drop test + leak test. Pre-shipment inspection in Guangdong, LFGB + REACH reports required.

中文摘要: 500ml玻璃罐, 竹盖硅胶圈, FOB深圳, 首单5000件, 请报EXW和FOB价格, 含开模费与样品费.

What a China-ready RFQ must include

1. Clear specs + OEM/ODM status

Materials, dimensions, colors, logo method, and whether the design is OEM (your design), ODM (factory design modified), or fully custom. State target price and MOQ expectations upfront.

2. Incoterms: EXW + FOB at minimum

Ask for both EXW (factory gate) and FOB (e.g. FOB Ningbo / Shenzhen) so you can compare factories fairly. Add CIF or DDP to your port if you want landed-cost comparison.

3. Quality control (AQL) + inspections

Define AQL levels (e.g. critical 0 / major 2.5 / minor 4.0), pre-shipment inspection rights, and testing requirements. Factories quote more carefully when QC is explicit.

4. Certifications + compliance

List what your market needs: CE, RoHS, REACH for the EU; FDA / CPSIA for the US; LFGB for food contact. Ask who pays for testing and whether existing certificates can be shared.

5. Packaging, lead time, samples & payment

Retail box vs. bulk, barcodes, lead time for mass production, sample cost and lead time, tooling/mould fees, and payment terms (typically 30% deposit + 70% before shipment).

6. Mandarin summary + response format

A short 中文 summary helps the sales rep forward your RFQ to engineering without translation loss. A response table (unit price by quantity tier, tooling, lead time) makes quotes comparable.

EXW vs FOB vs DDP — when to ask each

TermMeaningAsk it when
EXWFactory gate, you handle all freightYou have your own forwarder and want the bare factory price
FOBLoaded on ship at e.g. Ningbo / ShenzhenAlways — the baseline for comparing Chinese factories fairly
DDPDelivered to your door, duties paidYou want landed cost without managing customs yourself

Common mistakes when emailing Chinese suppliers

Guangdong vs Zhejiang + timing your RFQ

Guangdong factories (Shenzhen / Guangzhou) suit electronics-adjacent goods and fast tooling; Zhejiang (Ningbo / Yiwu) suits drinkware and small commodities with lower MOQs. State your preferred province in the RFQ but allow alternatives — you will see 5-10% price gaps for the same drawing. Avoid sending first RFQs in the 2 weeks before Chinese New Year: replies stall and tooling quotes expire. Ask for CNY pricing validity (60 days) and who owns the mould if you pay tooling.

China RFQ FAQ

What MOQ should I state for China factories?

State first order + annual estimate (e.g. 5k now, 20k/year) and ask for price breaks at 3k / 10k. Factories in Guangdong often accept lower MOQs if you accept their standard packaging.

Should I ask EXW or FOB from Chinese suppliers?

Ask both. FOB Shenzhen / Ningbo is the fair comparison baseline; EXW shows the bare factory price when you run your own forwarder. Add DDP only for landed-cost comparison.

How do samples and tooling work?

Ask separately for sample cost, sample lead time, tooling/mould fee, and who owns the mould. Never combine tooling into unit price — it hides scaling costs.

Do I need a Mandarin summary?

Yes. A 2-3 line 中文 summary lets sales forward your RFQ to engineering without translation loss and typically cuts one clarification round.

Related: RFQ template with filled example • How to send an RFQ on Alibaba • RFQ email scripts for vendors